1Site Fit and Access Mapping in Roswell
We start with access mapping and shell fit checks, because the pool has to reach the yard before it can be set. In Roswell, this step matters for narrow drives, older fences, and wooded backyards that change staging options.
2Layout and Setback Verification in Roswell
We use a layout stakeout to confirm pool position, equipment space, and setback limits. That keeps the project aligned with Roswell property conditions and reduces rework after excavation begins.
3Excavation and Base Prep in Roswell
We set the excavation depth and base prep for the selected fiberglass shell. This step helps the shell sit level and stable, and it matters in the local market where clay, slope, and runoff can affect the subgrade.
4Shell Placement and Plumbing Tie-In Roswell
We place the shell, then connect plumbing and circulation lines to the equipment pad. The sequence matters because Roswell weather can push delays, so a clean tie-in keeps the work moving once conditions are right.